Line clearance is a structured procedure for ensuring that the equipment and work area are free of products, documents and materials from the previous process that are not required for the next scheduled process, and that the equipment is clean and ready for the next scheduled process.

How can I get line clearance?

Line Clearance Checklist for Packing Line (Liquid)

  1. Check and ensure that the area/ equipment/ belt are visually clean.
  2. Check the area is free from previous product and unwanted materials.
  3. Check the proper gowning of personnel.
  4. Check the present status label which shows the details.

What does proper line clearance mean when working in the processing lab?

The line clearance is typically established as an independent WI with general instructions about removing any materials that are not required for the current production run, and a general cleaning of the area (typically a wipe down with 70% Isopropanol, but this will vary depending on the materials, local regulations …

Who is responsible for line clearance?

Production officer
2 Production officer is responsible for carrying out the line clearance.

How many types of line clearance are there?

Packaging Area/Line Clearance during batch/product change over

PACKAGING AREA / LINE CLEARANCE CHECKLIST – TYPE C
Previous Product :
1. Area cleaned Type C board displayed.
2. Packing equipment cleaned as per Type B/C cleaning procedure.
3. Packing area cleaning checklist Type – C filled by Officer -Production.

When should a line clearance be performed?

Line clearances are used in the labelling and packaging area as another control to prevent mix-up of product, the following steps must be conducted and verified prior to the start of packaging and labelling operation: Clean the area and machines, Remove all previous products from the area and machines.

What is ground clearance in transmission line?

Permissible Min ground Clearance of Electrical Line

KV Ground Clearance Over National Highway
66 KV 6.1 Meter 8.0 Meter
132 KV 6.1 Meter 8.6 Meter
220 KV 7.0 Meter 9.8 Meter
400KV 8.8 Meter 10.8 Meter

What are the GMP guidelines?

Good manufacturing practice (GMP) is a system for ensuring that products are consistently produced and controlled according to quality standards. It is designed to minimize the risks involved in any pharmaceutical production that cannot be eliminated through testing the final product.

What is reconciliation in GMP?

GMP reconciliation is the process used to ensure the scheme records agree with those of the National Insurance Contribution Office (NICO, part of HMRC). This enables a scheme to consider its data as clean and entirely reliable.

What is the minimum clearance of HV line?

(4) For extra-high voltage lines the clearance above ground shall not be less than 5.2 metres plus 0.3 metre for every 33,000 volts or part thereof by which the voltage of the line exceeds 33,000 volts: Provided that the minimum clearance along or across any street shall not be less than 6.1 metres.

Why ground clearance is important in transmission line?

Clearances required for field to be below 9 kV/m for 400 kV lines. We discuss above the effect of the clearance of the conductors above ground on the electric field. The higher the clearance, the lower the field. If the clearance is greater than the stated value, the electric field will be below 9 kV/m.

How do you do material reconciliation?

Material reconciliation takes place using standard process instruction category RECON, which must be assigned to the master recipe. This involves a dynamic function call. The process instruction RECON for material reconciliation must not be changed, but rather the standard version should be copied.

What is batch reconciliation?

Follow. Batch reconciliation can save a lot of time, particularly if your business experiences a high volume of transactions. Rather than reconciling transactions one at a time, Flare’s batch reconciliation allows you to select and reconcile multiple bank transactions.

What is the long time clearance of overhead line?

21.2 If the crossing is provided with a guarding, a minimum clearance of 2m shall be maintained between the bottom of the guard wire and the highest traction conductor….17. Clearance between the overhead line & railway track:

Normal System Voltage (kV) Min. Safe clearance (In metre)
66 2.00
110 2.25
132 2.50
220 3.50

What is minimum clearance provided for the 132kv line from the ground?

ANSWER: 6.4 m.

What is CGMP full form?

CGMP refers to the Current Good Manufacturing Practice regulations enforced by the FDA. CGMPs provide for systems that assure proper design, monitoring, and control of manufacturing processes and facilities.

How do I comply with GMP?

The first two GMP principles stress the importance of written procedures. In fact, the best way to comply with GMP regulations is to have well-written procedures and to carefully follow them. These written procedures give us the controls necessary to minimize the chance of mix-ups and errors in manufacturing a product.